IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0073 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,103 $760 Implemented
UM0072 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,823 $450 Implemented
UM0072 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,102 $8,496 Implemented
UM0072 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $800 $825 Implemented
NV0069 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,122 $246 Implemented
NV0069 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,737 $3,250 Implemented
NV0069 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $678 $100 Implemented
NV0069 # 03 Y:1996 03 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,603 $640 Implemented
NV0069 # 07 Y:1996 07 1996 OPTIMIZE PLANT POWER FACTOR $1,686 $3,960 Implemented
OK0509 # 01 Y:1996 01 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,243 $0 Implemented
OK0509 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,419 $855 Implemented
OK0509 # 02 Y:1996 02 1996 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $14,966 $18,000 Implemented
OK0509 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $538 $248 Implemented
OK0509 # 05 Y:1996 05 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $470 $460 Implemented
NV0069 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $100 Implemented
UM0068 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $5,202 $5,124 Implemented
UM0068 # 06 Y:1996 06 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,612 $3,100 Implemented
UM0068 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,473 $18,075 Implemented
UM0068 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $994 $1,630 Implemented
SF0103 # 11 Y:1996 11 1996 MINIMIZE WATER USAGE $734 $2,079 Implemented
SF0103 # 10 Y:1996 10 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,737 $4,970 Implemented
SF0103 # 09 Y:1996 09 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $581 $0 Implemented
SF0103 # 07 Y:1996 07 1996 UPGRADE CONTROLS ON COMPRESSORS $3,532 $2,100 Implemented
SF0103 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $672 $1,151 Implemented
NC0087 # 09 Y:1996 09 1996 SLOW INSERTION / WITHDRAWAL OF PARTS FROM DEGREASING TANK $3,360 $8,500 Implemented