IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3498 Fabricated Pipe And Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0686 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $36,618 Implemented
OK0686 # 04 Y:2004 04 2004 INSTALL SET-BACK TIMERS $1,577 $1,320 Implemented
OK0686 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,472 $262 Implemented
OK0686 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $3,350 $1,136 Implemented
OK0686 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $2,550 Implemented
OK0610 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $14,000 $1,670 Implemented
OK0583 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $500 Implemented
OK0583 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,107 $1,500 Implemented
OK0583 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,239 $25,525 Implemented
OK0522 # 08 Y:1997 08 1997 $10,400 $200 Implemented
OK0522 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-70 $386 Implemented
OK0522 # 01 Y:1997 01 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $844 $2,845 Implemented
OK0522 # 02 Y:1997 02 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,918 $3,500 Implemented
OK0522 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103 $200 Implemented
OK0509 # 01 Y:1996 01 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,243 $0 Implemented
OK0509 # 02 Y:1996 02 1996 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $14,966 $18,000 Implemented
OK0509 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,419 $855 Implemented
OK0509 # 05 Y:1996 05 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $470 $460 Implemented
OK0509 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $538 $248 Implemented
OK0265 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,364 $901 Implemented
OK0265 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $204 $450 Implemented
OK0265 # 07 Y:1988 07 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $53,297 $0 Implemented
OK0265 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,423 $15 Implemented
OK0265 # 02 Y:1988 02 1988 IMPROVE LUBRICATION PRACTICES $2,711 $0 Implemented
OK0249 # 03 Y:1988 03 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,682 $1,800 Implemented