IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0523 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,179 $50 Implemented
NC0523 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,803 $1,935 Implemented
WM0053 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,677 $19,918 Implemented
WM0053 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $512 Implemented
WM0053 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,731 $1,292 Implemented
WM0053 # 10 Y:2014 10 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,892 $0 Implemented
IA0525 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,330 $730 Implemented
IA0525 # 03 Y:2014 03 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,354 $105 Implemented
IA0525 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $584 $687 Implemented
IA0525 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,951 $100 Implemented
OK0890 # 02 Y:2014 02 2014 INSTALL COMMON HEADER ON COMPRESSORS $8,687 $4,800 Implemented
OK0890 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,200 $0 Implemented
OK0890 # 05 Y:2014 05 2014 AIR CONDITION ONLY SPACE NECESSARY $6,400 $1,230 Implemented
OK0890 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,700 $0 Implemented
OK0890 # 07 Y:2014 07 2014 USE MINIMUM SAFE OVEN VENTILATION $30,394 $1,000 Implemented
SD0484 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,136 $45,100 Implemented
SD0484 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,196 $1,300 Implemented
SD0484 # 04 Y:2014 04 2014 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $6,896 $400 Implemented
SD0484 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,758 $300 Implemented
SD0484 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $1,281 $3,700 Implemented
WM0038 # 09 Y:2014 09 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $149 $460 Implemented
WM0038 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $637 $1,519 Implemented
WM0038 # 04 Y:2014 04 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $622 $500 Implemented
WM0038 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,678 $1,768 Implemented
WM0038 # 02 Y:2014 02 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $172 $73 Implemented