IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

269

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0016 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,700 $15,500 Implemented
NL0016 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,400 $160,000 Implemented
IA0568 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,266 $9,189 Implemented
IA0568 # 06 Y:2016 06 2016 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $472 $200 Implemented
IA0568 # 01 Y:2016 01 2016 REVISE SMOKE CLEANUP FROM OPERATIONS $32,058 $60,740 Implemented
IA0568 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,386 $5,977 Implemented
IA0565 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,529 $165 Implemented
IA0565 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,846 $2,352 Implemented
IA0565 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,371 $500 Implemented
IA0565 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,046 $70 Implemented
IA0560 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $819 $1,000 Implemented
IA0560 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,092 $200 Implemented
IA0560 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,818 $1,011 Implemented
IA0547 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,121 $62,794 Implemented
IA0547 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $808 $2,466 Implemented
IA0547 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,141 $10,025 Implemented
IA0547 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,850 $546 Implemented
IA0544 # 02 Y:2015 02 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,538 $12,000 Implemented
IA0544 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $119 $70 Implemented
IA0544 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,685 $565 Implemented
IA0536 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $332 Implemented
IA0536 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,942 $244 Implemented
IA0536 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $6,563 Implemented
IA0536 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,930 $2,873 Implemented
IA0531 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,788 $70 Implemented