Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0754 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,033 $3,560 Implemented
OR0754 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,871 $2,675 Implemented
OR0748 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $3,913 $10,533 Implemented
OR0748 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,032 $9,520 Implemented
OR0748 # 04 Y:2022 04 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $99,431 $292,453 Implemented
OR0748 # 02 Y:2022 02 2022 FILTER AND REUSE HYDRAULIC OIL $34,830 $88,699 Implemented
OR0748 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,763 $1,880 Implemented
OR0697 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $250 Implemented
OR0697 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $25,653 $51,599 Implemented
OR0697 # 01 Y:2018 01 2018 USE MAGNETIC TECHNOLOGY TO TREAT WATER $201,762 $50,000 Implemented
OR0689 # 02 Y:2017 02 2017 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $18,000 $1,495 Implemented
OR0689 # 01 Y:2017 01 2017 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $12,509 $19,000 Implemented
OR0689 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,595 $5,595 Implemented
OR0608 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $32,340 $0 Implemented
OR0608 # 02 Y:2013 02 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,138 $55,641 Implemented
OR0500 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $31,500 Implemented
OR0500 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $36,300 $31,500 Implemented
OR0500 # 03 Y:2006 03 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $39,400 $42,000 Implemented
OR0470 # 05 Y:2004 05 2004 ELIMINATE/REDUCE AN OPERATION $1,185 $165 Implemented
OR0292 # 11 Y:1997 11 1997 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $375,000 $0 Implemented
OR0292 # 03 Y:1997 03 1997 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $11,080 $2,000 Implemented
OR0292 # 02 Y:1997 02 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $17,850 $0 Implemented
OR0292 # 09 Y:1997 09 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,215 $23,353 Implemented
OR0292 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,202 $1,144 Implemented
OR0292 # 05 Y:1997 05 1997 KEEP BOILER TUBES CLEAN $7,179 $500 Implemented