IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0443 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,968 $3,879 Implemented
IA0443 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $377 $65 Implemented
IA0443 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,934 $20,207 Implemented
IA0443 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $256 Implemented
IA0443 # 08 Y:2009 08 2009 OPTIMIZE PLANT POWER FACTOR $4,398 $4,659 Implemented
IA0348 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $535 Implemented
IA0348 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,829 $14,216 Implemented
IA0348 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,653 $4,596 Implemented
IA0348 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $651 $146 Implemented
IA0348 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $9,818 $10,704 Implemented
IA0320 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $520 $888 Implemented
IA0320 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $449 Implemented
IA0320 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,500 $0 Implemented
IA0263 # 02 Y:2001 02 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,475 $0 Implemented
IA0263 # 07 Y:2001 07 2001 $84,240 $0 Implemented
IA0263 # 08 Y:2001 08 2001 $74,880 $0 Implemented
IA0263 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,869 $1,014 Implemented
DS0163 # 07 Y:2000 07 2000 $640 $-1,560 Implemented
DS0161 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,330 $7,355 Implemented
DS0161 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,142 $2,040 Implemented
DS0161 # 08 Y:2000 08 2000 $1,203 $0 Implemented
DS0161 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $758 $1,130 Implemented
DS0161 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $1,323 $1,050 Implemented
IA0222 # 08 Y:1999 08 1999 $199,932 $425,000 Implemented
IA0222 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $391 $33 Implemented