IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

329

matching recommendations
Reset
SIC 3523 Farm Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0253 # 02 Y:2000 02 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $12,000 $14,500 Implemented
IA0253 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,005 $158 Implemented
GT0654 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $737 $150 Implemented
GT0654 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $0 Implemented
GT0654 # 06 Y:1998 06 1998 PAY UTILITY BILLS ON TIME $1,330 $0 Implemented
GT0654 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,740 $5,000 Implemented
DS0108 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,821 $15,624 Implemented
DS0108 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $323 $230 Implemented
DS0108 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,721 $140 Implemented
DS0108 # 04 Y:1998 04 1998 INSTALL SET-BACK TIMERS $4,634 $3,465 Implemented
DS0108 # 06 Y:1998 06 1998 RECOVER AND REUSE WASTE MATERIAL $595 $400 Implemented
DS0108 # 07 Y:1998 07 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,800 $500 Implemented
BD0100 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,880 $30,000 Implemented
WI0308 # 06 Y:1997 06 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $3,726 $1,000 Implemented
WI0308 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $90 Implemented
WI0308 # 04 Y:1997 04 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,950 $0 Implemented
WI0308 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $36,638 $2,500 Implemented
UM0094 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $18,874 $7,590 Implemented
UM0094 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $706 $1,185 Implemented
BD0090 # 01 Y:1997 01 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $33,305 $30,062 Implemented
BD0090 # 02 Y:1997 02 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,088 $17,646 Implemented
BD0090 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,231 $950 Implemented
BD0090 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $3,769 $2,250 Implemented
BD0090 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,069 $2,035 Implemented
BD0090 # 08 Y:1997 08 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $31,686 $29,850 Implemented