IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3523 Farm Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0100 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,880 $30,000 Implemented
WI0308 # 04 Y:1997 04 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,950 $0 Implemented
WI0308 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $36,638 $2,500 Implemented
WI0308 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $90 Implemented
WI0308 # 06 Y:1997 06 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $3,726 $1,000 Implemented
UM0094 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $18,874 $7,590 Implemented
UM0094 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $706 $1,185 Implemented
BD0090 # 09 Y:1997 09 1997 USE A RAG RECYCLE SERVICE $3,953 $0 Implemented
BD0090 # 02 Y:1997 02 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,088 $17,646 Implemented
BD0090 # 01 Y:1997 01 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $33,305 $30,062 Implemented
BD0090 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,231 $950 Implemented
BD0090 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $3,769 $2,250 Implemented
BD0090 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,069 $2,035 Implemented
BD0090 # 10 Y:1997 10 1997 $12,408 $480 Implemented
BD0090 # 08 Y:1997 08 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $31,686 $29,850 Implemented
GT0621 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $200 Implemented
GT0621 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $1,590 Implemented
GT0621 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,180 $0 Implemented
KU0474 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,680 $27,070 Implemented
KU0474 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,490 $6,950 Implemented
KU0474 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,270 $190 Implemented
KU0474 # 04 Y:1997 04 1997 ADJUST BURNERS FOR EFFICIENT OPERATION $660 $1,000 Implemented
KU0474 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,350 $4,950 Implemented
KU0474 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $140 $800 Implemented
DS0083 # 04 Y:1997 04 1997 RECOVER AND REUSE WASTE MATERIAL $3,750 $4,844 Implemented