Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
113
matching recommendationsSIC | 3533 | Oil And Gas Field Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1068 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,325 | $5,412 | Implemented |
OK1068 # 03 Y:2022 | 03 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $5,553 | $3,192 | Implemented |
OK1068 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,141 | $1,208 | Implemented |
OK1068 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,103 | $0 | Implemented |
OK1064 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,414 | $774 | Implemented |
OK1064 # 03 Y:2022 | 03 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $367 | $700 | Implemented |
OK1064 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,321 | $22,000 | Implemented |
OK0966 # 09 Y:2017 | 09 | 2017 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $36 | $100 | Implemented |
OK0966 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,676 | $17,550 | Implemented |
OK0966 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,570 | $17,250 | Implemented |
OK0966 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,526 | $21,137 | Implemented |
OK0966 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $74,450 | $305,694 | Implemented |
OK0966 # 02 Y:2017 | 02 | 2017 | BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED | $113,700 | $24,000 | Implemented |
OK0895 # 09 Y:2014 | 09 | 2014 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $854 | $70 | Implemented |
OK0895 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $706 | $1,400 | Implemented |
OK0895 # 04 Y:2014 | 04 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $669 | $1,452 | Implemented |
OK0678 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,817 | $3,690 | Implemented |
OK0678 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,075 | $823 | Implemented |
OK0678 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,836 | $10,835 | Implemented |
OK0678 # 07 Y:2004 | 07 | 2004 | INSTALL SET-BACK TIMERS | $3,347 | $2,200 | Implemented |
OK0678 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $546 | $1,154 | Implemented |
OK0678 # 04 Y:2004 | 04 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,162 | $800 | Implemented |
OK0649 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $104 | $37 | Implemented |
OK0649 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,956 | $3,504 | Implemented |
OK0612 # 04 Y:2001 | 04 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $463 | $0 | Implemented |