Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsSIC | 3537 | Industrial Trucks And Tractors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0343 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,173 | $7,306 | Implemented |
IA0343 # 07 Y:2004 | 07 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $39,733 | $10,000 | Implemented |
MS0214 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $26,748 | $7,400 | Implemented |
MS0214 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,371 | $11,500 | Implemented |
MS0214 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,766 | $288 | Implemented |
MS0214 # 05 Y:2002 | 05 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,288 | $270 | Implemented |
MS0214 # 06 Y:2002 | 06 | 2002 | DISCONNECT BALLASTS | $1,230 | $1,395 | Implemented |
MS0214 # 08 Y:2002 | 08 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $582 | $0 | Implemented |
MS0214 # 09 Y:2002 | 09 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $557 | $200 | Implemented |
IC0033 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,405 | $97,350 | Implemented |
IC0033 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,622 | $5,604 | Implemented |
IC0033 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,219 | $1,700 | Implemented |
IC0033 # 07 Y:2002 | 07 | 2002 | USE PLASTIC PALLETS INSTEAD OF WOOD | $10,750 | $22,000 | Implemented |
CO0475 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $300 | $490 | Implemented |
CO0475 # 05 Y:2000 | 05 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,430 | $0 | Implemented |
CO0475 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $34,630 | $100,000 | Implemented |
ND0360 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,566 | $560 | Implemented |
ND0360 # 07 Y:2000 | 07 | 2000 | USE OPTIMUM TEMPERATURE | $86 | $20 | Implemented |
NC0170 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,515 | $0 | Implemented |
NC0170 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,462 | $2,000 | Implemented |
DS0079 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $161 | $260 | Implemented |
DS0079 # 05 Y:1997 | 05 | 1997 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $5,732 | $7,500 | Implemented |
AR0084 # 01 Y:1996 | 01 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,999 | $2,301 | Implemented |
AR0084 # 02 Y:1996 | 02 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $391 | $0 | Implemented |
AR0084 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $766 | $200 | Implemented |