Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
933
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0279 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,890 | $500 | Implemented |
UF0356 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,843 | $21,108 | Implemented |
UF0356 # 03 Y:2005 | 03 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $6,348 | $2,000 | Implemented |
UF0356 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,008 | $700 | Implemented |
UF0356 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,295 | $2,194 | Implemented |
UF0356 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $1,232 | $1,450 | Implemented |
UF0356 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96 | $245 | Implemented |
UF0356 # 09 Y:2005 | 09 | 2005 | RECYCLE FLUORESCENT LAMPS | $0 | $3,496 | Implemented |
IC0088 # 01 Y:2004 | 01 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,664 | $0 | Implemented |
IC0088 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,563 | $459 | Implemented |
IC0088 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,547 | $400 | Implemented |
UM0262 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,194 | $1,248 | Implemented |
TA0074 # 03 Y:2004 | 03 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,340 | $2,128 | Implemented |
TA0074 # 04 Y:2004 | 04 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,590 | $43 | Implemented |
TA0074 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,504 | $360 | Implemented |
TA0074 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $625 | $600 | Implemented |
WI0470 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,353 | $5,780 | Implemented |
WI0470 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,484 | $896 | Implemented |
WI0470 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,293 | $0 | Implemented |
UM0246 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $6,140 | $700 | Implemented |
UM0246 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,885 | $100 | Implemented |
UM0246 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,380 | $500 | Implemented |
LE0171 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,638 | $0 | Implemented |
LE0171 # 03 Y:2003 | 03 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,645 | $6,000 | Implemented |
LE0171 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,863 | $608 | Implemented |