Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0307 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,100 | $6,233 | Implemented |
MZ0307 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $809 | $1,130 | Implemented |
OK0645 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $176 | $163 | Implemented |
OK0645 # 06 Y:2002 | 06 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $61,280 | $44,000 | Implemented |
OK0645 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,887 | $220 | Implemented |
KU0515 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $400,000 | $602,110 | Implemented |
KU0515 # 04 Y:1999 | 04 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $530 | $0 | Implemented |
KU0515 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,780 | $400 | Implemented |
KU0515 # 05 Y:1999 | 05 | 1999 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,140 | $7,830 | Implemented |
KU0454 # 10 Y:1995 | 10 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $157 | $176 | Implemented |
KU0454 # 09 Y:1995 | 09 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $831 | $865 | Implemented |
KU0454 # 07 Y:1995 | 07 | 1995 | USE PHOTOCELL CONTROLS | $548 | $120 | Implemented |
KU0454 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $778 | $1,140 | Implemented |
KU0454 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,625 | $8,741 | Implemented |
KU0454 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,681 | $10,200 | Implemented |
KU0454 # 01 Y:1995 | 01 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,987 | $18,760 | Implemented |
KU0339 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $83 | $119 | Implemented |
KU0339 # 07 Y:1991 | 07 | 1991 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $415 | $0 | Implemented |
KU0339 # 08 Y:1991 | 08 | 1991 | TURN OFF EQUIPMENT WHEN NOT IN USE | $144 | $0 | Implemented |
KU0339 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $577 | $350 | Implemented |
KU0339 # 04 Y:1991 | 04 | 1991 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $1,066 | $525 | Implemented |
KU0339 # 03 Y:1991 | 03 | 1991 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,071 | $0 | Implemented |
KU0339 # 02 Y:1991 | 02 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,315 | $1,860 | Implemented |
KU0339 # 01 Y:1991 | 01 | 1991 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $4,004 | $700 | Implemented |
KU0053 # 03 Y:1982 | 03 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,175 | $360 | Implemented |