IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 3548 Welding Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2106 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,356 $2,100 Implemented
MI0373 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,980 Implemented
MI0373 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,444 $25,685 Implemented
MI0373 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,619 $1,840 Implemented
MI0373 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $176 $480 Implemented
MI0373 # 04 Y:2020 04 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,395 $1,470 Implemented
MI0199 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,254 $5,975 Implemented
MI0199 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,954 $2,200 Implemented
MI0199 # 04 Y:2010 04 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,308 $7,450 Implemented
MI0199 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,329 $1,210 Implemented
MI0199 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $31,106 $2,000 Implemented
MI0199 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $37,073 $6,280 Implemented
MI0199 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,552 $4,531 Implemented
UM0362 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,058 $89,000 Implemented
UM0362 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,185 $400 Implemented
UM0362 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,351 $500 Implemented
UM0362 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,961 $3,048 Implemented
UM0362 # 07 Y:2010 07 2010 INSTALL STORM WINDOWS AND DOORS $3,301 $3,000 Implemented
UM0362 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,257 $2,000 Implemented
GT0845 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $8,290 $4,750 Implemented
GT0845 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,215 $2,000 Implemented
CO0584 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,220 $31,750 Implemented
UM0262 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $1,248 Implemented
UD0541 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,187 $400 Implemented
UD0425 # 05 Y:1994 05 1994 COMBINE UTILITY METERS $355 $0 Implemented