IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3569 General Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0028 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,919 $0 Implemented
MU0028 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $138 $348 Implemented
MU0028 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $863 $112 Implemented
MU0028 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $1,100 Implemented
MU0028 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $0 Implemented
UD0690 # 11 Y:2004 11 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $352 $0 Implemented
UD0690 # 04 Y:2004 04 2004 REDUCE FLUID FLOW RATES $4,171 $2,400 Implemented
UD0690 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,576 $7,366 Implemented
UD0690 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $170 Implemented
UD0690 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,580 $0 Implemented
UD0687 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,973 $1,000 Implemented
UD0687 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $2,430 $2,610 Implemented
UD0687 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $365 $450 Implemented
UD0687 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $15 Implemented
UD0639 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $2,052 Implemented
UD0639 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $450 $1,698 Implemented
UD0639 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $0 Implemented
UD0545 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,984 $10,116 Implemented
UD0534 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,347 $29,176 Implemented
UD0534 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $7,454 $1,400 Implemented
UD0534 # 07 Y:1997 07 1997 $35,000 $75,000 Implemented
UD0362 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $500 $1,500 Implemented
UD0362 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $952 $0 Implemented
UD0208 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $31,222 $9,000 Implemented
UD0208 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,200 $1,200 Implemented