IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

785

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0369 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $9,750 $13,500 Implemented
NC0369 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,420 $1,500 Implemented
NC0369 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,910 $100 Implemented
NC0369 # 05 Y:2007 05 2007 KEEP BOILER TUBES CLEAN $2,955 $1,000 Implemented
NC0369 # 06 Y:2007 06 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,730 $0 Implemented
TT0002 # 01 Y:2007 01 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,371 $0 Implemented
TT0002 # 08 Y:2007 08 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,553 $14,000 Implemented
TT0002 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,324 $1,400 Implemented
NC0359 # 02 Y:2007 02 2007 DEVELOP A REPAIR/REPLACE POLICY $496 $610 Implemented
NC0359 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,232 $100 Implemented
NC0359 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $356 $718 Implemented
IC0124 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,122 $180,000 Implemented
IC0124 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,585 $53,959 Implemented
UM0314 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12,963 $2,480 Implemented
UM0314 # 06 Y:2006 06 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,473 $400 Implemented
SU0241 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,054 $2,928 Implemented
SU0241 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $24,622 Implemented
SU0241 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19 $0 Implemented
SU0241 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $765 $201 Implemented
NC0333 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,913 $300 Implemented
NC0333 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $395 $150 Implemented
NC0333 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $135 $185 Implemented
NC0333 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $100 Implemented
AS0414 # 02 Y:2006 02 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $28,518 $20,000 Implemented
AS0414 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $17,731 $200 Implemented