IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

725

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0266 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,291 $97 Implemented
MO0266 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,816 $2,451 Implemented
MO0266 # 05 Y:1999 05 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,475 $0 Implemented
TP0006 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $6,461 $4,589 Implemented
TP0006 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $24 Implemented
TP0006 # 04 Y:1999 04 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,787 $7,300 Implemented
IA0228 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,046 $344 Implemented
IA0228 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $634 $581 Implemented
IA0228 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $2,320 Implemented
IA0228 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $226 $50 Implemented
IA0228 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,067 $0 Implemented
BD0140 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,301 $500 Implemented
BD0140 # 06 Y:1999 06 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,041 $840 Implemented
BD0140 # 09 Y:1999 09 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,353 $10,000 Implemented
BD0140 # 11 Y:1999 11 1999 MINIMIZE WATER USAGE $1,471 $2,590 Implemented
BD0140 # 12 Y:1999 12 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $243,360 $500,000 Implemented
BD0140 # 13 Y:1999 13 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $107,799 $26,500 Implemented
BD0140 # 14 Y:1999 14 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,200 $16,000 Implemented
IA0222 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $561 $931 Implemented
IA0222 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $391 $33 Implemented
IA0222 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $421 $226 Implemented
IA0222 # 06 Y:1999 06 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,600 $900 Implemented
IA0222 # 08 Y:1999 08 1999 ADD ADDITIONAL PRODUCTION SHIFT $199,932 $425,000 Implemented
UD0575 # 03 Y:1999 03 1999 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $39,515 $10,000 Implemented
UD0575 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $14,341 $15,000 Implemented