Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,791
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0198 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,667 | $400 | Implemented |
HO0198 # 06 Y:1999 | 06 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,661 | $500 | Implemented |
HO0198 # 07 Y:1999 | 07 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $4,800 | $5,000 | Implemented |
HO0198 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $6,228 | $10,000 | Implemented |
SD0214 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,699 | $10,196 | Implemented |
SD0214 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $800 | $0 | Implemented |
SD0214 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,832 | $1,000 | Implemented |
SD0214 # 07 Y:1999 | 07 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $3,600 | $2,300 | Implemented |
UD0562 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $10,130 | $0 | Implemented |
UD0562 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,677 | $1,040 | Implemented |
NC0157 # 06 Y:1999 | 06 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,015 | $3,000 | Implemented |
NC0157 # 07 Y:1999 | 07 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $8,000 | $200 | Implemented |
NC0157 # 09 Y:1999 | 09 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $3,193 | $0 | Implemented |
WI0339 # 02 Y:1999 | 02 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $245 | $300 | Implemented |
WI0339 # 03 Y:1999 | 03 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,824 | $1,000 | Implemented |
WI0339 # 06 Y:1999 | 06 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,865 | $2,000 | Implemented |
AM0342 # 06 Y:1999 | 06 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $261 | $40 | Implemented |
TN0651 # 02 Y:1999 | 02 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $9,040 | $9,140 | Implemented |
TN0651 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $3,020 | $1,605 | Implemented |
HO0192 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $409 | $1,120 | Implemented |
HO0192 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $2,083 | $520 | Implemented |
HO0192 # 05 Y:1999 | 05 | 1999 | INSTALL REPLACEMENT DOORS | $562 | $700 | Implemented |
HO0192 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $960 | $600 | Implemented |
HO0192 # 10 Y:1999 | 10 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,000 | $1,000 | Implemented |
DS0127 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,707 | $13,320 | Implemented |