IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0508 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $14,349 $3,750 Implemented
IA0508 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,512 $1,000 Implemented
IA0508 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,758 $976 Implemented
IA0508 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,845 $1,000 Implemented
IA0508 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $689 $1,590 Implemented
IA0508 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $6,113 $6,000 Implemented
IA0503 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $975 $2,238 Implemented
IA0503 # 06 Y:2013 06 2013 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,063 $2,204 Implemented
IA0503 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $15,108 $8,304 Implemented
IA0458 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,769 $2,181 Implemented
IA0458 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,683 $2,050 Implemented
IA0458 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $816 $500 Implemented
IA0458 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,473 $1,020 Implemented
IA0458 # 08 Y:2010 08 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $26,636 $22,000 Implemented
IA0458 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $48,853 $11,000 Implemented
IA0322 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,973 $16,562 Implemented
IA0322 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,109 $783 Implemented
IA0322 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,303 $4,835 Implemented
IA0322 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $174 $514 Implemented
IA0259 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $530 $1,073 Implemented
IA0259 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,277 $139 Implemented
IA0259 # 07 Y:2000 07 2000 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $1,445 $5,020 Implemented
IA0259 # 08 Y:2000 08 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $208 $30 Implemented
IA0214 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $764 Implemented
IA0214 # 07 Y:1999 07 1999 ELIMINATE/REDUCE AN OPERATION $97,749 $800 Implemented