IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
SIC 3612 Transformers, Except Electronic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0214 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,508 $0 Implemented
WM0214 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $1,500 Implemented
WM0214 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $2,250 Implemented
LE0558 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $474 $2,500 Implemented
LE0558 # 06 Y:2024 06 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,995 $37,000 Implemented
LE0558 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,762 $1,400 Implemented
LE0558 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,010 $1,600 Implemented
LE0558 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $5,799 Implemented
LE0558 # 05 Y:2024 05 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,840 $18,014 Implemented
TT0302 # 01 Y:2023 01 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $141,741 $909,720 Implemented
TT0302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,127 $1,500 Implemented
TT0302 # 05 Y:2023 05 2023 METER WASTE WATER $18,930 $1,100 Implemented
TT0227 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $2,646 $2,000 Implemented
TT0227 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,227 $2,000 Implemented
TT0227 # 03 Y:2019 03 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,828 $5,000 Implemented
GT0926 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,597 $57,656 Implemented
SU0474 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $1,094 $3,500 Implemented
SU0474 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,517 $2,500 Implemented
SU0474 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $357 $650 Implemented
SU0474 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $8,523 $18,735 Implemented
SU0474 # 03 Y:2019 03 2019 USE PHOTOCELL CONTROLS $425 $570 Implemented
WM0120 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,818 $35,678 Implemented
WM0120 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $2,251 Implemented
BD0462 # 04 Y:2015 04 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,049 $4,000 Implemented
BD0462 # 05 Y:2015 05 2015 REPLACE BOILER $3,962 $7,604 Implemented