IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
Reset
SIC 3612 Transformers, Except Electronic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0227 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $2,646 $2,000 Implemented
TT0227 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,227 $2,000 Implemented
TT0227 # 03 Y:2019 03 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,828 $5,000 Implemented
GT0926 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,597 $57,656 Implemented
SU0474 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $8,523 $18,735 Implemented
SU0474 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $1,094 $3,500 Implemented
SU0474 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,517 $2,500 Implemented
SU0474 # 03 Y:2019 03 2019 USE PHOTOCELL CONTROLS $425 $570 Implemented
SU0474 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $357 $650 Implemented
WM0120 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,818 $35,678 Implemented
WM0120 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $2,251 Implemented
BD0462 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,604 $3,500 Implemented
BD0462 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $300 Implemented
BD0462 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $9,937 $8,800 Implemented
BD0462 # 04 Y:2015 04 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,049 $4,000 Implemented
BD0462 # 05 Y:2015 05 2015 REPLACE BOILER $3,962 $7,604 Implemented
SF0454 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,894 $68,183 Implemented
SF0454 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,081 $0 Implemented
SF0454 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,343 $0 Implemented
MZ0094 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,711 $27,900 Implemented
MZ0094 # 07 Y:2012 07 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,836 $900 Implemented
MZ0094 # 05 Y:2012 05 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,785 $30,700 Implemented
MZ0094 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $621 $0 Implemented
MZ0094 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,057 $1,160 Implemented
TT0072 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $16,018 $0 Implemented