IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
SIC 3612 Transformers, Except Electronic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0462 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $300 Implemented
BD0462 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,604 $3,500 Implemented
BD0462 # 04 Y:2015 04 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,049 $4,000 Implemented
SF0454 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,894 $68,183 Implemented
SF0454 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,081 $0 Implemented
SF0454 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,343 $0 Implemented
MZ0094 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,057 $1,160 Implemented
MZ0094 # 07 Y:2012 07 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,836 $900 Implemented
MZ0094 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,711 $27,900 Implemented
MZ0094 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $621 $0 Implemented
MZ0094 # 05 Y:2012 05 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,785 $30,700 Implemented
TT0072 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $16,018 $0 Implemented
NC0418 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,663 $100 Implemented
NC0418 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,535 $5,000 Implemented
TT0052 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,444 $3,000 Implemented
WV0419 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,262 $161,162 Implemented
WV0419 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $528 Implemented
NC0400 # 02 Y:2010 02 2010 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $9,007 $37,000 Implemented
NC0400 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $1,761 $4,346 Implemented
NC0400 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $75 $200 Implemented
MS0336 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,875 $35,094 Implemented
MS0336 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $7,801 $17,819 Implemented
MS0336 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,881 $391 Implemented
TT0027 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,297 $250 Implemented
TT0027 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,340 $5,000 Implemented