IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
SIC 3699 Electrical Equipment & Supplies, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0091 # 01 Y:2012 01 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $190,000 $5,000 Implemented
MZ0091 # 02 Y:2012 02 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,699 $0 Implemented
MZ0091 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,504 $0 Implemented
MZ0091 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,133 $0 Implemented
MZ0091 # 06 Y:2012 06 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,311 $9,516 Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $0 Implemented
SU0159 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,187 $800 Implemented
SU0159 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $276 $523 Implemented
UF0311 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $20,300 $1,640 Implemented
UF0311 # 04 Y:2002 04 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,812 $20,000 Implemented
UF0283 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,592 $1,440 Implemented
UF0283 # 08 Y:2001 08 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,806 $0 Implemented
UF0283 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $1,347 $2,485 Implemented
NC0198 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,845 $820 Implemented
NC0198 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,448 $300 Implemented
NC0198 # 04 Y:2000 04 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,264 $0 Implemented
UD0599 # 07 Y:2000 07 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,401 $1,000 Implemented
UD0599 # 04 Y:2000 04 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,956 $2,500 Implemented
UD0599 # 06 Y:2000 06 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,628 $0 Implemented
UD0599 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,987 $20,000 Implemented
UD0599 # 02 Y:2000 02 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,795 $0 Implemented
UD0588 # 02 Y:2000 02 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,705 $0 Implemented
MS0124 # 06 Y:1998 06 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $51 $14 Implemented