IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0030 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,042 $1,697 Implemented
MA0726 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $608 $500 Implemented
SD0479 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,591 $59,600 Implemented
SD0479 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,299 $21,315 Implemented
MZ0137 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $1,989 $1,920 Implemented
MZ0137 # 03 Y:2014 03 2014 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $856 $2,050 Implemented
MZ0137 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,610 $0 Implemented
MZ0137 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $805 $1,475 Implemented
MZ0137 # 06 Y:2014 06 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,378 $0 Implemented
WM0041 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $2,510 Implemented
WM0041 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $330 $100 Implemented
WM0041 # 05 Y:2014 05 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,016 $7,200 Implemented
TT0126 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $5,874 $24,000 Implemented
TT0126 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,406 $7,500 Implemented
TT0126 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,851 $4,000 Implemented
TT0126 # 04 Y:2014 04 2014 DISCONNECT BALLASTS $346 $110 Implemented
TT0126 # 05 Y:2014 05 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $2,806 $4,900 Implemented
SD0480 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,662 $300 Implemented
UM0439 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,596 $2,500 Implemented
UM0439 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $27,566 $4,000 Implemented
MA0723 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,304 $90,000 Implemented
MA0723 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,745 $110,500 Implemented
MA0723 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,628 $5,000 Implemented
MA0723 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,158 $1,250 Implemented
OK0872 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,899 $8,580 Implemented