IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,376

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0141 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $613 $102 Implemented
TN0633 # 01 Y:1998 01 1998 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $100,000 $122,130 Implemented
TN0633 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,960 $7,010 Implemented
TN0633 # 04 Y:1998 04 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $2,770 $5,450 Implemented
TN0633 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,625 $7,110 Implemented
UD0547 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $228,030 $30,000 Implemented
UD0547 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $181,440 $75,000 Implemented
UD0547 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,335 $28,000 Implemented
UD0547 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,918 $0 Implemented
UD0547 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,126 $57,752 Implemented
UD0547 # 08 Y:1998 08 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,849 $500 Implemented
SF0139 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,317 $0 Implemented
SF0139 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $182 $0 Implemented
SF0139 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,895 $506 Implemented
SF0139 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,855 $1,430 Implemented
SF0139 # 07 Y:1998 07 1998 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $646 $671 Implemented
SF0139 # 08 Y:1998 08 1998 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $327 $370 Implemented
SF0139 # 11 Y:1998 11 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,352 $26,690 Implemented
SF0139 # 18 Y:1998 18 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $339,000 $150,000 Implemented
UM0116 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $663 $2,419 Implemented
UM0116 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $364 $1,200 Implemented
UM0116 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $19,654 $4,350 Implemented
UM0116 # 05 Y:1998 05 1998 METER WASTE WATER $1,447 $150 Implemented
UM0116 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $2,565 $0 Implemented
AM0321 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,825 $600 Implemented