IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0493 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $81,971 $0 Implemented
SF0493 # 02 Y:2016 02 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,064 $1,350 Implemented
SF0358 # 12 Y:2008 12 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $606 $2,130 Implemented
SF0358 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $351 $230 Implemented
SF0358 # 09 Y:2008 09 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,062 $2,259 Implemented
SF0358 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,224 $5,375 Implemented
SF0358 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,987 $0 Implemented
SF0358 # 13 Y:2008 13 2008 INSULATE BARE EQUIPMENT $2,327 $8,208 Implemented
SF0358 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,536 $4,596 Implemented
SF0358 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $467 $0 Implemented
SF0358 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $180 $97 Implemented
LM0098 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $700 Implemented
LM0098 # 04 Y:2005 04 2005 INSTALL SENSORS TO DETECT DEFECTS $94,133 $49,500 Implemented
LM0098 # 05 Y:2005 05 2005 DEVELOP STANDARD OPERATING PROCEDURES $216,000 $11,800 Implemented
SF0242 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,518 $1,217 Implemented
SF0242 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,642 $300 Implemented
SF0242 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,176 $572 Implemented
SF0241 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,590 $0 Implemented
LM0013 # 08 Y:2001 08 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $16,434 $0 Implemented
LM0013 # 07 Y:2001 07 2001 MODIFY WORKLOAD $43,680 $5,000 Implemented
LM0013 # 06 Y:2001 06 2001 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $19,656 $319 Implemented
LM0013 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,776 $300 Implemented
LM0013 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $0 Implemented
LM0013 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,040 $1,050 Implemented
SD0282 # 04 Y:2001 04 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,804 $3,550 Implemented