Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
189
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0356 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,120 | $2,680 | Implemented |
MZ0356 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $519 | $415 | Implemented |
MZ0356 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,117 | $14,802 | Implemented |
MZ0343 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,575 | $28,807 | Implemented |
MZ0343 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,711 | $360 | Implemented |
MZ0343 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,951 | $31,059 | Implemented |
MZ0343 # 04 Y:2023 | 04 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $8,146 | $1,330 | Implemented |
MZ0343 # 07 Y:2023 | 07 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $52,726 | $2,400 | Implemented |
MZ0324 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,050 | $7,800 | Implemented |
MZ0324 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,278 | $240 | Implemented |
MZ0324 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $269 | $340 | Implemented |
MZ0324 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,260 | $480 | Implemented |
MZ0292 # 12 Y:2020 | 12 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,528 | $502,000 | Implemented |
MZ0292 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $460 | $1,000 | Implemented |
MZ0292 # 13 Y:2020 | 13 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,837 | $450 | Implemented |
MZ0292 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,098 | $5,000 | Implemented |
MZ0292 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $43 | $73 | Implemented |
MZ0292 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,645 | $29,820 | Implemented |
MZ0292 # 05 Y:2020 | 05 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $130 | $50 | Implemented |
MZ0292 # 09 Y:2020 | 09 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,588 | $240 | Implemented |
MZ0285 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,668 | $1,820 | Implemented |
MZ0285 # 06 Y:2019 | 06 | 2019 | USE COMPRESSOR AIR FILTERS | $1,546 | $360 | Implemented |
MZ0285 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,338 | $2,880 | Implemented |
MZ0241 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,547 | $4,050 | Implemented |
MZ0241 # 02 Y:2017 | 02 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,238 | $3,570 | Implemented |