IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0292 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,268 $50 Implemented
TT0292 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,223 $4,750 Implemented
TT0292 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,314 $15,941 Implemented
TT0292 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,057 $2,190 Implemented
TT0292 # 03 Y:2023 03 2023 AIR CONDITION ONLY SPACE NECESSARY $8,884 $18,000 Implemented
TT0284 # 02 Y:2023 02 2023 MINIMIZE WATER USAGE $10,675 $240 Implemented
TT0284 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,804 $10,150 Implemented
TT0284 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $8,764 $13,000 Implemented
TT0273 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $65,016 $5,000 Implemented
TT0273 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $1,926 Implemented
TT0273 # 11 Y:2022 11 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $356 $700 Implemented
TT0273 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,155 $2,860 Implemented
TT0259 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300,781 $111,421 Implemented
TT0259 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,779 $2,738 Implemented
TT0259 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $62,325 $1,640 Implemented
TT0249 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,133 $1,500 Implemented
TT0249 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $87,163 $208,768 Implemented
TT0236 # 02 Y:2020 02 2020 ADOPT IN-HOUSE MATERIAL GENERATION $28,629 $16,000 Implemented
TT0236 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,250 $128,083 Implemented
TT0231 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,957 $153,710 Implemented
TT0231 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,033 $25 Implemented
TT0231 # 02 Y:2019 02 2019 INSTALL COMMON HEADER ON COMPRESSORS $13,982 $1,050 Implemented
TT0231 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $4,149 $10,500 Implemented
TT0231 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $886 $40 Implemented
TT0231 # 06 Y:2019 06 2019 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $650 $1,650 Implemented