IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0590 # 13 Y:2020 13 2020 DEVELOP A REPAIR/REPLACE POLICY $101 $271 Implemented
WV0590 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,881 $1,468 Implemented
WV0590 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $16,468 $5,109 Implemented
WV0590 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,451 $66,168 Implemented
WV0590 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,957 $813 Implemented
WV0590 # 11 Y:2020 11 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,693 $1,000 Implemented
WV0590 # 12 Y:2020 12 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $100 Implemented
NC0626 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,034 $135 Implemented
NC0626 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,564 $40,273 Implemented
NC0626 # 07 Y:2019 07 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,977 $200 Implemented
NC0543 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,402 $100 Implemented
NC0543 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,805 $100 Implemented
NC0543 # 08 Y:2015 08 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $192 $500 Implemented
NC0543 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $80 Implemented
NC0543 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,078 $68,997 Implemented
TN0667 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,782 $80,100 Implemented
TN0667 # 03 Y:1999 03 1999 METER WASTE WATER $26,280 $2,980 Implemented
TN0645 # 01 Y:1998 01 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $408,630 $24,685 Implemented
TN0645 # 10 Y:1998 10 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,390 $8,000 Implemented
TN0645 # 11 Y:1998 11 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $5,000 Implemented
TN0489 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,663 $955 Implemented
TN0489 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $500 $480 Implemented
TN0489 # 07 Y:1993 07 1993 OPTIMIZE PLANT POWER FACTOR $7,337 $13,300 Implemented
TN0383 # 06 Y:1989 06 1989 IMPROVE LUBRICATION PRACTICES $274 $0 Implemented
TN0383 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $777 $270 Implemented