IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0635 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $483 $600 Implemented
MZ0274 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $705 $1,100 Implemented
MZ0274 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,363 $2,480 Implemented
MZ0274 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,585 $3,900 Implemented
MZ0274 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,654 $104,076 Implemented
MZ0274 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,193 $4,500 Implemented
TT0212 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $283 $250 Implemented
TT0212 # 09 Y:2018 09 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $3,775 $5,000 Implemented
TT0212 # 04 Y:2018 04 2018 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $38,635 $13,000 Implemented
TT0212 # 05 Y:2018 05 2018 METER WASTE WATER $34,128 $1,900 Implemented
TT0212 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,776 $32,000 Implemented
UA0185 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $1,034 $830 Implemented
UA0185 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $4,645 Implemented
UA0185 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $342 $85 Implemented
UA0174 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $221 $564 Implemented
UA0174 # 05 Y:2017 05 2017 USE OPTIMUM TEMPERATURE $33,738 $8,460 Implemented
UA0174 # 06 Y:2017 06 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $826 $2,820 Implemented
UA0174 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,405 $588 Implemented
NC0527 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,636 $1,503 Implemented
NC0527 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,147 $140,860 Implemented
NC0527 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,403 $100 Implemented
NC0527 # 02 Y:2014 02 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $23,485 $5,000 Implemented
NC0527 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,768 $4,256 Implemented
NC0527 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $13,647 $10,000 Implemented
AM0663 # 03 Y:2014 03 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,730 $0 Implemented