Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1091 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,533 | $9,900 | Implemented |
OK1091 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,210 | $9,834 | Implemented |
OK1091 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,017 | $630 | Implemented |
OK1079 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $763 | $10,500 | Implemented |
OK1079 # 03 Y:2023 | 03 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $5,711 | $3,994 | Implemented |
OK1079 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,184 | $0 | Implemented |
OK1079 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $824 | $3,200 | Implemented |
OK1079 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $800 | $3,624 | Implemented |
OK1079 # 06 Y:2023 | 06 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $424 | $318 | Implemented |
OK1083 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $926 | $2,799 | Implemented |
OK1083 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $29 | $123 | Implemented |
OK0994 # 01 Y:2018 | 01 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,051 | $590 | Implemented |
OK0994 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,575 | $29,950 | Implemented |
OK0994 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,833 | $8,422 | Implemented |
OK0880 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,983 | $61,440 | Implemented |
OK0832 # 09 Y:2012 | 09 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,579 | $1,170 | Implemented |
OK0801 # 12 Y:2010 | 12 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,196 | $21,075 | Implemented |
OK0801 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $995 | $2,625 | Implemented |
OK0801 # 03 Y:2010 | 03 | 2010 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $9,699 | $3,000 | Implemented |
OK0801 # 02 Y:2010 | 02 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,599 | $34,948 | Implemented |
OK0801 # 01 Y:2010 | 01 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6,511 | $78,169 | Implemented |
OK0790 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $13 | Implemented |
OK0790 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,871 | $1,750 | Implemented |
OK0790 # 03 Y:2010 | 03 | 2010 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $32,076 | $0 | Implemented |
OK0790 # 11 Y:2010 | 11 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $334 | $418 | Implemented |