IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

383

matching recommendations
Reset
SIC 373 Ship And Boat Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0198 # 04 Y:1998 04 1998 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,355 $787 Implemented
OR0314 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,110 $0 Implemented
OR0314 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,164 $4,524 Implemented
OR0314 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,150 $5,034 Implemented
OR0314 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,645 $500 Implemented
OR0314 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,787 $2,000 Implemented
OR0314 # 08 Y:1998 08 1998 UPGRADE CONTROLS ON COMPRESSORS $4,685 $3,280 Implemented
OD0101 # 02 Y:1998 02 1998 USE A DIFFERENT OR RECYCLED RAW MATERIAL $106,000 $252,000 Implemented
OD0101 # 03 Y:1998 03 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $33,876 $0 Implemented
OD0101 # 04 Y:1998 04 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $16,127 $0 Implemented
UF0192 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,669 $3,114 Implemented
UF0192 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $626 $844 Implemented
UF0192 # 01 Y:1998 01 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,313 $1,200 Implemented
UF0192 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,830 $1,850 Implemented
UF0192 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36,140 $0 Implemented
ME0227 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,383 $7,504 Implemented
ME0227 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $790 $960 Implemented
ME0227 # 03 Y:1997 03 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $756 $0 Implemented
ME0227 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $515 $588 Implemented
ME0227 # 06 Y:1997 06 1997 USE OPTIMUM THICKNESS INSULATION $408 $75 Implemented
ME0227 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $359 $100 Implemented
ME0227 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $185 Implemented
ME0227 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $540 $1,188 Implemented
TN0611 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $34,735 $41,885 Implemented
TN0611 # 04 Y:1997 04 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,330 $3,240 Implemented