IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,872

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0282 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,563 $60 Implemented
AS0282 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,843 $4,974 Implemented
AS0282 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,580 $120 Implemented
AS0282 # 08 Y:2000 08 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $624 $60 Implemented
NC0194 # 01 Y:2000 01 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $429 $835 Implemented
NC0194 # 02 Y:2000 02 2000 INSTALL SKYLIGHTS $3,443 $7,000 Implemented
NC0194 # 03 Y:2000 03 2000 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $13,561 $29,000 Implemented
NC0194 # 05 Y:2000 05 2000 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,846 $20,200 Implemented
CO0466 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,420 $10,000 Implemented
CO0466 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $470 $1,000 Implemented
CO0466 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $640 $0 Implemented
CO0466 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $1,030 $320 Implemented
CO0466 # 08 Y:2000 08 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $50,740 $40,000 Implemented
IA0240 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,330 $0 Implemented
IA0240 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,222 $0 Implemented
IA0240 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,996 $463 Implemented
IA0240 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,204 $100 Implemented
IA0240 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,648 $623 Implemented
MO0270 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,783 $36,941 Implemented
MA0446 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,463 $20,800 Implemented
MA0446 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,237 $3,575 Implemented
MA0446 # 06 Y:1999 06 1999 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,849 $0 Implemented
MA0446 # 07 Y:1999 07 1999 AIR CONDITION ONLY SPACE NECESSARY $1,137 $2,670 Implemented
MA0446 # 10 Y:1999 10 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $638 $300 Implemented
MA0443 # 02 Y:1999 02 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $656 $150 Implemented