IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

797

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0178 # 12 Y:1998 12 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,429 $30,000 Implemented
HO0178 # 14 Y:1998 14 1998 USE HIGH PRESSURE WASH SYSTEMS $3,945 $500 Implemented
SD0197 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,252 $2,520 Implemented
SD0197 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $350 Implemented
SD0197 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,535 $2,000 Implemented
SD0197 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,149 $23,968 Implemented
SD0197 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,516 $2,000 Implemented
SD0197 # 08 Y:1998 08 1998 WASH AND REUSE RAGS ON-SITE $711 $600 Implemented
SD0197 # 09 Y:1998 09 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $1,350 $1,000 Implemented
SF0137 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $744 $3,630 Implemented
KU0485 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,310 $190 Implemented
KU0485 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $660 Implemented
KU0485 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $470 $300 Implemented
KU0485 # 06 Y:1997 06 1997 RECOVER AND REUSE COOLING WATER $1,080 $1,180 Implemented
KU0485 # 07 Y:1997 07 1997 METER WASTE WATER $230 $100 Implemented
UF0186 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $2,264 $1,984 Implemented
UF0186 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $313 $133 Implemented
UF0186 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $15,189 $35,749 Implemented
UF0186 # 06 Y:1997 06 1997 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $2,700 $5,800 Implemented
CO0393 # 01 Y:1997 01 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,000 $1,170 Implemented
CO0393 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $240 Implemented
CO0393 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $403 Implemented
CO0393 # 05 Y:1997 05 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $201,090 $3,970 Implemented
CO0393 # 06 Y:1997 06 1997 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $9,120 $10,000 Implemented
CO0393 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $400 $0 Implemented