Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 3841 | Surgical And Medical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0604 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $21,457 | $280 | Implemented |
SD0638 # 13 Y:2023 | 13 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $98,322 | $418,100 | Implemented |
SD0638 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $740 | $500 | Implemented |
SD0638 # 03 Y:2023 | 03 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $161 | $250 | Implemented |
SD0638 # 11 Y:2023 | 11 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,174 | $306 | Implemented |
SF0565 # 02 Y:2021 | 02 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $35,739 | $5,236 | Implemented |
SF0565 # 06 Y:2021 | 06 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,819 | $622 | Implemented |
SD0530 # 06 Y:2016 | 06 | 2016 | USE PHOTOCELL CONTROLS | $1,002 | $2,590 | Implemented |
SD0530 # 05 Y:2016 | 05 | 2016 | INSTALL SKYLIGHTS | $1,125 | $3,360 | Implemented |
SD0530 # 04 Y:2016 | 04 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,261 | $861 | Implemented |
SD0530 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,876 | $200 | Implemented |
SD0530 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,344 | $1,500 | Implemented |
SD0530 # 01 Y:2016 | 01 | 2016 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,594 | $36,400 | Implemented |
SF0295 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,996 | $5,126 | Implemented |
SF0295 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,565 | $7,217 | Implemented |
SF0295 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,378 | $0 | Implemented |
SD0339 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,112 | $320 | Implemented |
SD0339 # 03 Y:2004 | 03 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,831 | $0 | Implemented |
SD0325 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $71,754 | $0 | Implemented |
SD0325 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,956 | $32,725 | Implemented |
SD0325 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $37,849 | $2,000 | Implemented |
SD0325 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $36,071 | $1,000 | Implemented |
SD0148 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $640 | $0 | Implemented |
SD0148 # 07 Y:1996 | 07 | 1996 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $784 | $1,450 | Implemented |
SD0148 # 06 Y:1996 | 06 | 1996 | INSTALL OCCUPANCY SENSORS | $5,177 | $2,429 | Implemented |