IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,162

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0306 # 05 Y:1997 05 1997 UPGRADE OBSOLETE EQUIPMENT $80 $0 Implemented
TN0615 # 03 Y:1997 03 1997 USE RADIANT HEATER FOR SPOT HEATING $16,845 $13,160 Implemented
TN0615 # 10 Y:1997 10 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $255 $280 Implemented
WI0301 # 03 Y:1997 03 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $10,763 $23,000 Implemented
WI0301 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $768 $998 Implemented
NV0082 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $122 $200 Implemented
NV0082 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $1,179 $1,154 Implemented
NV0082 # 07 Y:1997 07 1997 COVER OPEN TANKS $897 $375 Implemented
AR0117 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $741 $250 Implemented
AR0117 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,697 $130 Implemented
AR0117 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,002 $1,830 Implemented
AR0117 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,185 $517 Implemented
AR0117 # 09 Y:1997 09 1997 RECYCLE CLEANING SOLVENT AND REUSE $4,637 $6,150 Implemented
AR0117 # 10 Y:1997 10 1997 MOVE PRODUCT USING MECHANICAL MEANS $75,030 $60,000 Implemented
HO0154 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,944 $21,668 Implemented
HO0154 # 06 Y:1997 06 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $2,563 $10,000 Implemented
TN0607 # 01 Y:1997 01 1997 MOVE PRODUCT USING MECHANICAL MEANS $27,000 $57,660 Implemented
TN0607 # 04 Y:1997 04 1997 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $7,615 $2,400 Implemented
AS0199 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $410 $0 Implemented
AS0199 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,976 $140 Implemented
AS0199 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,635 $3,183 Implemented
AS0199 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $570 Implemented
AS0199 # 11 Y:1997 11 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,037 $0 Implemented
SD0166 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,538 $4,410 Implemented
SD0166 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,386 $2,800 Implemented