Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,976
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2437 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $47,984 | $340,586 | n/a |
KS2437 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,870 | $69,278 | n/a |
KS2437 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,218 | $60 | n/a |
KS2437 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $22,668 | $1,600 | n/a |
KS2437 # 08 Y:2024 | 08 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,546 | $4,072 | n/a |
KS2437 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,199 | $5,960 | n/a |
KS2437 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,975 | $88,610 | n/a |
KS2437 # 09 Y:2024 | 09 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $65,208 | $627,000 | n/a |
KS2437 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $771 | $2,184 | n/a |
DL0249 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,174 | $15,000 | n/a |
DL0249 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,102 | $10,000 | n/a |
DL0249 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,172 | $13,000 | n/a |
DL0249 # 08 Y:2025 | 08 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $5,230 | $38,000 | n/a |
DL0249 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,100 | $30,000 | n/a |
DL0249 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $35,225 | $8,950 | n/a |
DL0249 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,975 | $20,000 | n/a |
DL0249 # 03 Y:2025 | 03 | 2025 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,075 | $1,777 | n/a |
LE0589 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,173 | $4,403 | n/a |
LE0589 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $651 | $1,275 | n/a |
LE0589 # 05 Y:2025 | 05 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,588 | $5,000 | n/a |
LE0589 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,206 | $19,974 | n/a |
LE0589 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,428 | $3,300 | n/a |
LE0589 # 01 Y:2025 | 01 | 2025 | INSTALL BACK-UP EQUIPMENT | $125,769 | $50,000 | n/a |
LE0589 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,179 | $800 | n/a |
IP0203 # 01 Y:2024 | 01 | 2024 | USE AUTOMATIC FLOW CONTROL | $56,666 | $700 | n/a |