IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

976

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0516 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,511 $200 Implemented
LE0516 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,124 $1,200 Implemented
MZ0316 # 01 Y:2021 01 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,730 $7,800 Implemented
MZ0316 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,326 $480 Implemented
MZ0316 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $80 Implemented
MZ0316 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,786 $11,055 Implemented
MZ0316 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,866 $3,614 Implemented
MZ0316 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,220 $3,485 Implemented
UU0191 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,749 $38,000 Implemented
UU0191 # 02 Y:2021 02 2021 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,428 $14,400 Implemented
UU0191 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,303 $150 Implemented
UU0191 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $4,613 Implemented
UU0191 # 08 Y:2021 08 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $114 $50 Implemented
TT0260 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $783 $700 Implemented
TT0260 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $401 $553 Implemented
LE0515 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,213 $0 Implemented
LE0515 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,306 $1,500 Implemented
LE0515 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,441 $1,500 Implemented
LE0515 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,658 $6,990 Implemented
LE0515 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $150,000 $700,000 Implemented
WV0612 # 11 Y:2021 11 2021 INSTALL SET-BACK TIMERS $611 $1,110 Implemented
WV0612 # 10 Y:2021 10 2021 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $701 $397 Implemented
WV0612 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,008 $8,132 Implemented
WV0612 # 06 Y:2021 06 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,641 $4,320 Implemented
WV0612 # 03 Y:2021 03 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,446 $16,700 Implemented