IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,054

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1701 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,942 $10,000 Implemented
CL1701 # 03 Y:2017 03 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $12,535 $3,650 Implemented
CL1701 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,647 $22,515 Implemented
CL1701 # 05 Y:2017 05 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $5,838 $13,500 Implemented
GT0900 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,820 $250 Implemented
GT0900 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,671 $250 Implemented
GT0900 # 03 Y:2017 03 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,890 $180 Implemented
GT0900 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,980 $127,113 Implemented
DL0176 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,117 $0 Implemented
DL0176 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,410 $4,465 Implemented
DL0176 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,798 $4,484 Implemented
DL0176 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,869 $2,965 Implemented
IP0086 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,463 $0 Implemented
IP0086 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $8 Implemented
IP0086 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $522 $204 Implemented
IP0086 # 13 Y:2017 13 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,424 $31,458 Implemented
LE0438 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,701 $1,000 Implemented
LE0438 # 02 Y:2017 02 2017 REPAIR OR REPLACE STEAM TRAPS $47,084 $4,750 Implemented
LE0438 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,264 $710 Implemented
LE0438 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,655 $10,500 Implemented
LE0438 # 06 Y:2017 06 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $185,116 $366,000 Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
SU0444 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,081 $0 Implemented
SU0444 # 06 Y:2017 06 2017 UPGRADE OBSOLETE EQUIPMENT $162 $556 Implemented