IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,655

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TP0010 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $428 $450 n/a
TP0010 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $173 $267 n/a
TP0010 # 08 Y:2000 08 2000 ADD AREA LIGHTING SWITCHES $111 $0 n/a
WI0362 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,236 $1,860 Not Implemented
WI0362 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,550 $740 Not Implemented
WI0362 # 03 Y:2000 03 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,619 $16,000 Not Implemented
WI0362 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,130 $2,150 Not Implemented
HO0218 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,368 $41,546 Implemented
HO0218 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,628 $1,500 Implemented
HO0218 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $4,499 $2,640 Implemented
OK0588 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,131 $24,500 Not Implemented
OK0588 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $757 $800 Not Implemented
OK0588 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,673 $3,000 Not Implemented
OK0588 # 04 Y:2000 04 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $525 $60 Not Implemented
OK0588 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,662 $6,960 Not Implemented
OR0361 # 01 Y:2000 01 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,471 $1,200 Not Implemented
OR0361 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,408 $13,918 Not Implemented
OR0361 # 03 Y:2000 03 2000 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $3,020 $190 Not Implemented
MS0151 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $20,769 $17,100 Not Implemented
MS0151 # 02 Y:2000 02 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,446 $100 Not Implemented
MS0151 # 03 Y:2000 03 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,122 $4,900 Not Implemented
NC0181 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,376 $5,400 Not Implemented
NC0181 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,754 $65,000 Not Implemented
NC0181 # 03 Y:2000 03 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,564 $37,378 Not Implemented
NC0181 # 04 Y:2000 04 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,692 $18,000 Not Implemented