IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,397

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0028 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,053 $18,871 n/a
LE0556 # 05 Y:2024 05 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $11,775 $16,000 Not Implemented
UU0235 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $12,478 $23,282 Not Implemented
UU0235 # 04 Y:2024 04 2024 USE OPTIMUM THICKNESS INSULATION $6,968 $8,826 Not Implemented
DL0233 # 02 Y:2024 02 2024 USE OPTIMUM TEMPERATURE $516 $0 Implemented
DL0233 # 03 Y:2024 03 2024 USE OPTIMUM TEMPERATURE $769 $1,439 Implemented
UU0236 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,320 $46,000 Implemented
UU0236 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $16,698 $11,570 Implemented
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 Implemented
IC0294 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $979 $608 Implemented
IC0294 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $3,704 $5,717 Not Implemented
NL0090 # 04 Y:2023 04 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,454 $1,764 Not Implemented
UA0281 # 08 Y:2023 08 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,490 $49,464 Not Implemented
CC0027 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $9,831 $10,000 n/a
TR0048 # 04 Y:2023 04 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,211 $8,620 Implemented
UU0239 # 03 Y:2024 03 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $9,905 $9,905 Implemented
UU0239 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $6,144 $7,887 Implemented
SU0544 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $1,502 $400 Implemented
UL2314 # 08 Y:2023 08 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,765 $100 Implemented
UL2314 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,470 $15,600 Not Implemented
UD1070 # 01 Y:2024 01 2024 REPAIR AND ELIMINATE STEAM LEAKS $5,413 $1,000 Implemented
IC0293 # 05 Y:2024 05 2024 USE OPTIMUM THICKNESS INSULATION $17,140 $38,685 Implemented
WV0655 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $8,192 $5,240 Implemented
WV0655 # 02 Y:2023 02 2023 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $39,676 $165,000 Not Implemented
WV0655 # 01 Y:2023 01 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $50,347 $17,230 Not Implemented