IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0075 # 08 Y:1995 08 1995 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,520 $2,092 Implemented
OK0478 # 01 Y:1995 01 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $63,653 $25,000 Implemented
CO0347 # 06 Y:1995 06 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,890 $2,880 Implemented
NC0075 # 04 Y:1995 04 1995 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $5,067 $8,000 Implemented
WI0251 # 08 Y:1995 08 1995 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,740 $6,000 Implemented
TN0552 # 03 Y:1995 03 1995 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,137 $0 Implemented
IA0114 # 12 Y:1995 12 1995 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,440 $5,725 Implemented
SD0127 # 02 Y:1995 02 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $18,822 $32,000 Implemented
SD0122 # 04 Y:1995 04 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $765 $1,600 Implemented
MA0339 # 02 Y:1995 02 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,027 $3,770 Implemented
OR0235 # 05 Y:1995 05 1995 USE MULTIPLE-EFFECT EVAPORATORS $2,900 $9,500 Implemented
AS0143 # 02 Y:1995 02 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,244 $60,000 Implemented
OD0027 # 01 Y:1995 01 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $41,731 $48,000 Implemented
WV0058 # 02 Y:1995 02 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,841 $0 Implemented
SD0112 # 03 Y:1995 03 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,144 $1,600 Implemented
OD0024 # 01 Y:1995 01 1995 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,967 $0 Implemented
OD0022 # 04 Y:1995 04 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,277 $4,655 Implemented
MA0327 # 05 Y:1995 05 1995 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,033 $0 Implemented
UM0016 # 03 Y:1995 03 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,760 $530 Implemented