IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,762

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0491 # 03 Y:2016 03 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,307 $7,500 Implemented
BD0491 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,131 $2,800 Implemented
BD0491 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,994 $20 Implemented
BD0491 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $778 $600 Implemented
BD0491 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,456 $2,700 Implemented
BD0491 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,427 $1,000 Implemented
BD0491 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,795 $6,550 Implemented
BD0491 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $190 Implemented
BD0490 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $630 $800 Implemented
BD0490 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,902 $3,069 Implemented
BD0487 # 06 Y:2016 06 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $581 $2,500 Implemented
BD0486 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,328 $5,483 Implemented
BD0486 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,570 $9,300 Implemented
BD0486 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $450 Implemented
BD0486 # 12 Y:2016 12 2016 SHUT OFF PILOTS IN STANDBY EQUIPMENT $245 $40 Implemented
BD0486 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,788 $600 Implemented
BD0486 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,771 $6,450 Implemented
BD0486 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,570 $7,350 Implemented
BD0486 # 01 Y:2016 01 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,814 $20,000 Implemented
BD0485 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,599 $20 Implemented
BD0485 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,962 $350 Implemented
BD0485 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $5,111 Implemented
BD0482 # 02 Y:2016 02 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,096 $840 Implemented
BD0482 # 07 Y:2016 07 2016 CONVERT TO ELECTROSTATIC POWDER COATING $186,807 $160,000 Implemented
BD0482 # 03 Y:2016 03 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,149 $2,000 Implemented