IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,585

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0139 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $97,133 $238,263 Implemented
LE0139 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,359 $0 Implemented
LE0141 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,018 $0 Implemented
LE0141 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,005 $100 Implemented
LE0141 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,139 $882 Implemented
LE0138 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $0 Implemented
LE0138 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,471 $100 Implemented
LE0138 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $1,551 $60 Implemented
LE0137 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $14,099 $11,750 Implemented
LE0137 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,615 $3,000 Implemented
LE0135 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,451 $0 Implemented
LE0135 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,792 $0 Implemented
LE0135 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $1,066 $200 Implemented
LE0135 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $62,395 $12,000 Implemented
LE0135 # 08 Y:2002 08 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,654 $630 Implemented
LE0134 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,457 $1,500 Implemented
LE0134 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,609 $25,249 Implemented
LE0134 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,676 $1,200 Implemented
LE0133 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $78,742 $0 Implemented
LE0133 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $983 $0 Implemented
LE0133 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $750 Implemented
LE0133 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,163 $0 Implemented
LE0132 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $675 $130 Implemented
LE0132 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
LE0131 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,624 $0 Implemented