IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,766

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0678 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,204 $5,760 Implemented
MA0678 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $9,343 $0 Implemented
MA0678 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,186 $0 Implemented
MA0676 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $204,367 $98,845 Implemented
MA0676 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,721 $2,750 Implemented
MA0676 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $593 $1,250 Implemented
MA0675 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $2,590 $950 Implemented
MA0672 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,965 $3,935 Implemented
MA0672 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,777 $8,300 Implemented
MA0672 # 07 Y:2011 07 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,750 $0 Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
MA0673 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $200 Implemented
MA0671 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,780 $3,550 Implemented
MA0671 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $200 Implemented
MA0670 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $11,262 $5,845 Implemented
MA0670 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $3,931 $7,260 Implemented
MA0670 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,994 $1,800 Implemented
MA0669 # 01 Y:2011 01 2011 REPLACE BOILER $28,774 $63,300 Implemented
MA0669 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,179 $11,190 Implemented
MA0669 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,848 $1,500 Implemented
MA0669 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $410 $550 Implemented
MA0668 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,378 $1,800 Implemented
MA0668 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,899 $11,500 Implemented
MA0668 # 03 Y:2011 03 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,401 $11,610 Implemented