IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,766

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0572 # 09 Y:2005 09 2005 REPAIR AND ELIMINATE STEAM LEAKS $160 $138 Implemented
MA0571 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $46,372 $49,355 Implemented
MA0571 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,977 $25,856 Implemented
MA0571 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $7,370 $1,900 Implemented
MA0571 # 05 Y:2005 05 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,826 $29,170 Implemented
MA0570 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $27,226 $1,624 Implemented
MA0570 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,028 $21,736 Implemented
MA0570 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,127 $30,357 Implemented
MA0570 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,365 $0 Implemented
MA0570 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,708 $7,000 Implemented
MA0570 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $600 Implemented
MA0569 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,234 $7,312 Implemented
MA0569 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,082 $494 Implemented
MA0569 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $5,248 Implemented
MA0568 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,082 $7,750 Implemented
MA0568 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,788 $12,000 Implemented
MA0568 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $5,122 $6,750 Implemented
MA0568 # 05 Y:2005 05 2005 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $4,092 $6,000 Implemented
MA0567 # 01 Y:2004 01 2004 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,900 $270,000 Implemented
MA0567 # 04 Y:2004 04 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,762 $1,000 Implemented
MA0567 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $4,156 $6,867 Implemented
MA0567 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $1,615 $1,369 Implemented
MA0566 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $148,951 $35,885 Implemented
MA0566 # 02 Y:2004 02 2004 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $113,441 $191,180 Implemented
MA0566 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,400 $20,000 Implemented