IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,766

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0479 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,900 $8,400 Implemented
MA0479 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $550 Implemented
MA0479 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $0 Implemented
MA0479 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $750 $1,250 Implemented
MA0481 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,820 $30,000 Implemented
MA0481 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,390 $5,500 Implemented
MA0481 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,370 $7,000 Implemented
MA0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $1,315 Implemented
MA0481 # 07 Y:2001 07 2001 INSULATE FEEDWATER TANK $375 $1,000 Implemented
MA0480 # 03 Y:2000 03 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,330 $8,000 Implemented
MA0480 # 04 Y:2000 04 2000 AIR CONDITION ONLY SPACE NECESSARY $10,600 $5,000 Implemented
MA0480 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,450 $27,000 Implemented
MA0480 # 08 Y:2000 08 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,620 $2,000 Implemented
MA0480 # 09 Y:2000 09 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $930 $0 Implemented
MA0480 # 10 Y:2000 10 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,660 $5,000 Implemented
MA0480 # 11 Y:2000 11 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,020 $0 Implemented
MA0480 # 12 Y:2000 12 2000 INSTALL OCCUPANCY SENSORS $12,215 $1,000 Implemented
MA0478 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $6,350 $5,500 Implemented
MA0478 # 04 Y:2000 04 2000 INSULATE FEEDWATER TANK $3,300 $2,500 Implemented
MA0478 # 05 Y:2000 05 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,960 $0 Implemented
MA0478 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $550 Implemented
MA0478 # 10 Y:2000 10 2000 INSTALL OCCUPANCY SENSORS $320 $450 Implemented
MA0477 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,200 $11,700 Implemented
MA0477 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $410 $500 Implemented
MA0476 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,100 $24,000 Implemented