Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,929
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0660 # 05 Y:2010 | 05 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $23,123 | $0 | Implemented |
MA0659 # 01 Y:2010 | 01 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $35,538 | $103,290 | Implemented |
MA0659 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,141 | $119,100 | Implemented |
MA0659 # 03 Y:2010 | 03 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $20,648 | $35,545 | Not Implemented |
MA0659 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,781 | $7,735 | Not Implemented |
MA0659 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,273 | $1,800 | Implemented |
MA0657 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,606 | $38,400 | Not Implemented |
MA0657 # 02 Y:2010 | 02 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,052 | $12,150 | Implemented |
MA0657 # 03 Y:2010 | 03 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,527 | $4,840 | Not Implemented |
MA0657 # 04 Y:2010 | 04 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $1,169 | $0 | Implemented |
MA0657 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,401 | $480 | Implemented |
MA0657 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $2,125 | $7,500 | Not Implemented |
MA0657 # 07 Y:2010 | 07 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,635 | $2,400 | Implemented |
MA0654 # 01 Y:2009 | 01 | 2009 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $22,566 | $39,500 | Not Implemented |
MA0654 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $15,750 | $30,000 | Implemented |
MA0654 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,377 | $18,330 | Implemented |
MA0654 # 04 Y:2009 | 04 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,876 | $9,840 | Not Implemented |
MA0653 # 01 Y:2009 | 01 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $110,550 | $270,000 | Not Implemented |
MA0653 # 02 Y:2009 | 02 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $37,210 | $68,000 | Not Implemented |
MA0653 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $16,188 | $752 | Implemented |
MA0653 # 04 Y:2009 | 04 | 2009 | CLOSE OFF UNNEEDED STEAM LINES | $3,551 | $500 | Not Implemented |
MA0653 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,840 | $7,510 | Implemented |
MA0653 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,375 | $6,125 | Not Implemented |
MA0648 # 01 Y:2009 | 01 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,103 | $31,813 | Not Implemented |
MA0648 # 02 Y:2009 | 02 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $54,137 | $59,160 | Not Implemented |