Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0369 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,599 | $7,900 | Implemented |
MZ0369 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $23,108 | $9,760 | Implemented |
MZ0369 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,668 | $35,570 | Implemented |
MZ0366 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,668 | $59,968 | Implemented |
MZ0366 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,674 | $14,000 | Implemented |
MZ0366 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,395 | $800 | Implemented |
MZ0367 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,969 | $3,120 | Implemented |
MZ0367 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $852 | $400 | Implemented |
MZ0367 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,987 | $1,000 | Implemented |
MZ0365 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,949 | $1,000 | Implemented |
MZ0365 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,036 | $6,500 | Implemented |
MZ0365 # 04 Y:2024 | 04 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $96 | $520 | Implemented |
MZ0365 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,741 | $805 | Implemented |
MZ0294 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $506 | $50 | Implemented |
MZ0294 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $1,295 | $2,760 | Implemented |
MZ0277 # 09 Y:2019 | 09 | 2019 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $409 | $1,200 | Implemented |
MZ0277 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,816 | $3,021 | Implemented |
MZ0277 # 07 Y:2019 | 07 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $70,665 | $233,814 | Implemented |
MZ0277 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $55,889 | $160 | Implemented |
MZ0277 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $1,650 | $2,700 | Implemented |
MZ0277 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,416 | $4,211 | Implemented |
MZ0065 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,183 | $3,000 | Implemented |
MZ0065 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,073 | $1,500 | Implemented |
MZ0065 # 04 Y:2011 | 04 | 2011 | USE SOLAR HEAT TO HEAT WATER | $300 | $2,500 | Implemented |
MZ0065 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,106 | $2,120 | Implemented |