IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0416 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $568 Implemented
NC0416 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,117 $50 Implemented
NC0416 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,948 $100 Implemented
NC0416 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $415 $949 Implemented
NC0417 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,199 $100 Implemented
NC0415 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $911 $1,846 Implemented
NC0415 # 07 Y:2010 07 2010 $8,000 $15,750 Implemented
NC0415 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,456 $3,200 Implemented
NC0415 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $146 $50 Implemented
NC0415 # 06 Y:2010 06 2010 $12,000 $1,000 Implemented
NC0406 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $508 $920 Implemented
NC0406 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,958 $3,256 Implemented
NC0406 # 10 Y:2010 10 2010 $276,388 $214,700 Implemented
NC0406 # 04 Y:2010 04 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,743 $50,000 Implemented
NC0406 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,177 $50 Implemented
NC0406 # 11 Y:2010 11 2010 $20,625 $50,000 Implemented
NC0406 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,835 $100 Implemented
NC0413 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,066 $1,000 Implemented
NC0413 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,796 $50 Implemented
NC0413 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,881 $100 Implemented
NC0413 # 03 Y:2010 03 2010 INSULATE FEEDWATER TANK $283 $337 Implemented
NC0412 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $2,841 $4,995 Implemented
NC0412 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,233 $100 Implemented
NC0412 # 05 Y:2010 05 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $7,153 $15,100 Implemented
NC0412 # 02 Y:2010 02 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $25,289 $50 Implemented