Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
589
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0008 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $111 | $0 | Not Implemented |
NL0007 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,200 | $77,400 | Not Implemented |
NL0007 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $47,300 | $5,400 | Implemented |
NL0007 # 03 Y:2017 | 03 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $36,200 | $1,700 | Implemented |
NL0007 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,300 | $67,600 | Implemented |
NL0007 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,000 | $3,100 | Not Implemented |
NL0007 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,250 | $12,000 | Implemented |
NL0007 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $2,700 | $840 | Implemented |
NL0006 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,351 | $69,750 | Implemented |
NL0006 # 02 Y:2017 | 02 | 2017 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $14,999 | $22,000 | Implemented |
NL0006 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,100 | $0 | Implemented |
NL0006 # 04 Y:2017 | 04 | 2017 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,082 | $4,000 | Implemented |
NL0006 # 05 Y:2017 | 05 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,213 | $0 | Implemented |
NL0004 # 01 Y:2017 | 01 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $93,000 | $125,000 | Implemented |
NL0004 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $65,107 | $300,000 | Implemented |
NL0004 # 03 Y:2017 | 03 | 2017 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $30,789 | $30,000 | Implemented |
NL0004 # 04 Y:2017 | 04 | 2017 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $6,396 | $1,100 | Implemented |
NL0004 # 05 Y:2017 | 05 | 2017 | COVER OPEN TANKS | $4,000 | $5,200 | Implemented |
NL0004 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $823 | $2,300 | Implemented |
NL0005 # 01 Y:2017 | 01 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $106,860 | $650,000 | Not Implemented |
NL0005 # 02 Y:2017 | 02 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $35,435 | $57,984 | Not Implemented |
NL0005 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,055 | $60,000 | Not Implemented |
NL0005 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $800 | $6,424 | Implemented |
NL0003 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,412 | $15,000 | Not Implemented |
NL0003 # 02 Y:2017 | 02 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $1,797 | $14,000 | Implemented |