IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

589

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0008 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $111 $0 Not Implemented
NL0007 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $62,200 $77,400 Not Implemented
NL0007 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,300 $5,400 Implemented
NL0007 # 03 Y:2017 03 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $36,200 $1,700 Implemented
NL0007 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,300 $67,600 Implemented
NL0007 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,000 $3,100 Not Implemented
NL0007 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,250 $12,000 Implemented
NL0007 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $2,700 $840 Implemented
NL0006 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,351 $69,750 Implemented
NL0006 # 02 Y:2017 02 2017 DISTILL CONTAMINATED SOLVENTS FOR REUSE $14,999 $22,000 Implemented
NL0006 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,100 $0 Implemented
NL0006 # 04 Y:2017 04 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,082 $4,000 Implemented
NL0006 # 05 Y:2017 05 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,213 $0 Implemented
NL0004 # 01 Y:2017 01 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $93,000 $125,000 Implemented
NL0004 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $65,107 $300,000 Implemented
NL0004 # 03 Y:2017 03 2017 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $30,789 $30,000 Implemented
NL0004 # 04 Y:2017 04 2017 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $6,396 $1,100 Implemented
NL0004 # 05 Y:2017 05 2017 COVER OPEN TANKS $4,000 $5,200 Implemented
NL0004 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $823 $2,300 Implemented
NL0005 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $106,860 $650,000 Not Implemented
NL0005 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,435 $57,984 Not Implemented
NL0005 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,055 $60,000 Not Implemented
NL0005 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $6,424 Implemented
NL0003 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,412 $15,000 Not Implemented
NL0003 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $1,797 $14,000 Implemented