IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,401

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0378 # 03 Y:2006 03 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,633 $0 Implemented
SD0378 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,124 $15,000 Implemented
SD0378 # 05 Y:2006 05 2006 USE MINIMUM STEAM OPERATING PRESSURE $1,208 $0 Implemented
SD0378 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $2,957 $384 Implemented
SD0378 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,312 $6,160 Implemented
SD0376 # 03 Y:2006 03 2006 AVOID FROST FORMATION ON EVAPORATORS $16,408 $31,225 Implemented
SD0376 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,062 $31,291 Implemented
SD0376 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,642 $0 Implemented
SD0376 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $502 Implemented
SD0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,903 $13,350 Implemented
SD0375 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,793 $3,000 Implemented
SD0374 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,927 $7,500 Implemented
SD0374 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,769 $140 Implemented
SD0374 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,982 $220 Implemented
SD0374 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $688 $350 Implemented
SD0374 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,046 $52,243 Implemented
SD0372 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,173 $140 Implemented
SD0372 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,723 $16,563 Implemented
SD0371 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,710 $140 Implemented
SD0369 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,291 $0 Implemented
SD0369 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,896 $10,102 Implemented
SD0369 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $395 $80 Implemented
SD0369 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $285 $161 Implemented
SD0365 # 02 Y:2005 02 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $570,334 $1,600,000 Implemented
SD0365 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $313,658 $79,766 Implemented